| 4th Jan | Ropley | signal box | | code phone changed for different model |
| 13th Feb | Medstead | signal box | | Alton spt relay set testing |
| 28th Feb | Ropley | signal box | | code phone replaced with original |
| 28th Feb | Ropley | signal box | 531 | 7100 tele changed for 7208 |
| 28th Feb | Ropley | water tower | | tele broken - changed |
| 28th Feb | Medstead | signal box | | code phone - left hand key OOO - adjusted |
| 1st Mar | Alresford | down home | | tele faulty - changed |
| 13th Mar | Alton | exchange | | SPT in service to Medstead testing box to box during steam gala |
| 29th Mar | Alresford | | | mains and UPS failed service restored |
| 17th Apr | Medstead | station office | 336 | line fitted + cordless phone |
| 26th Apr | Medstead | exchange | | exchange line hung - extn 332 |
| 14th May | Alton | ticket booth | | line dead - wires pulled out of socket |
| 15th May | Alton | station | 433 | 20 pair tie cable run betweeen DP 2 and 3 |
| 17th May | Alton | shop | 499 | swipe line - cable pair suspect no longer used ATA recovered |
| 24th May | Medstead | exchange | | AEM 2 OOS loose OF link - possibly due to earlier cabe tidying |
| 24th May | Alton | exchange | 499 | moved to AEM to provide test number facility |
| 24th May | Medstead | S and T workshop | 332 | extension bell connected |
| 6th June | Ropley | booking office | 526 | line dead - line cord was found plugged into headset socket |
| 12th June | Medstead | exchange | | general tidying of inverter 240v leads |
| 28th July | Medstead | signal box | | tie cable for SPT circuits |
| 28th July | Alton | relay room | | tie cable for SPT circuits |
| 16th Aug | Medstead | station | | new cables exchange to station and signal box |
| 22nd Aug | Alresford | station office | 236 | extension bell connected plus answer key for 235 |
| 23rd Aug | Medstead | station | | circuits changed over to new cables |
| 29th Aug | Ropley | exchange lines | | overhead wire brought down diverted onto u/g cable |
| 5th Sept | Alton | signal box | | terminated 50 pair from MDF box connection 301 in electrical cupboard |
| 13th Sept | Medstead | station | | cabling for cat5 circuit to station office |
| 13th Sept | Alton | station | | proving pair for SPTs |
| 25th Sept | Alton | station | | 50 pair run from electrical cupboard to track crossing |
| October | Alton | station | | cable work and connecting SPTs |
| 25th Oct | Alton | relay room | 432 | phone faulty replaced |
| 25th Oct | Alresford | general office | 224 | phone recovered found unplugged |
| Nov | Alton | | | work on SPT equipment |
| 8th Dec | Medstead | signal box | | alarm - fuse 4 blown |
| 28th Dec | Alresford | down home | | SPT - tele faulty |
| 28th Dec | Alresford | general office | | unable to plug mic into talking timetable machine |