| January | | | | |
| Ropley | signal box | | code phone changed for different model |
| | | | |
| February | | | | |
| Medstead | signal box | | Alton SPT relay set testing |
| Ropley | signal box | | code phone replaced with original |
| Ropley | signal box | | 7100 tele changed for 7208 |
| Ropley | water tower | | tele broken - changed |
| Medstead | signal box | | code phone - left hand key OOO - adjusted |
| March | | | | |
| Alresford | down home | | tele faulty - changed |
| Alton | exchange | | SPT in service to Medstead testing box to box during steam gala |
| Alresford | | | mains and UPS failed service restored |
| April | | | | |
| Medstead | station office | | line fitted + cordless phone |
| Medstead | exchange | | exchange line hung - extn 332 |
| May | | | | |
| Alton | ticket booth | | line dead - wires pulled out of socket |
| Alton | station | | 20 pair tie cable run betweeen DP 2 and 3 |
| Alton | shop | | swipe line - cable pair suspect no longer used ATA recovered |
| Medstead | exchange | | AEM 2 OOS loose OF link - possibly due to earlier cable tidying |
| Alton | exchange | | moved to AEM to provide test number facility |
| Medstead | S and T workshop | | extension bell connected |
| June | | | | |
| Ropley | booking office | | line dead - line cord was found plugged into headset socket |
| Medstead | exchange | | general tidying of inverter 240v leads |
| July | | | | |
| Medstead | signal box | | tie cable for SPT circuits |
| Alton | relay room | | tie cable for SPT circuits |
| August | | | | |
| Medstead | station | | new cables exchange to station and signal box |
| Alresford | station office | | extension bell connected plus answer key for 235 |
| Medstead | station | | circuits changed over to new cables |
| Ropley | exchange lines | | overhead wire brought down diverted onto u/g cable |
| September | | | | |
| Alton | signal box | | terminated 50 pair from MDF box connection 301 in electrical cupboard |
| Medstead | station | | cabling for cat5 circuit to station office |
| Alton | station | | proving pair for SPTs |
| Alton | station | | 50 pair run from electrical cupboard to track crossing |
| October | | | | |
| Alton | station | | cable work and connecting SPTs |
| Alton | relay room | | phone faulty replaced |
| Alresford | general office | | phone recovered found unplugged |
| November | | | | |
| Alton | | | work on SPT equipment |
| December | | | | |
| Medstead | signal box | | alarm - fuse 4 blown |
| Alresford | down home | | SPT - tele faulty |
| | general office | | unable to plug mic into talking timetable machine Home |